Construction estimating glossary.

By Natha Mohamed M.M., Founder of TapeLine · Updated 16 November 2026 · 2 min read

Plain-language definitions of terms used in quantity take-off and estimating.

Quantity take-off
Measuring lengths, areas, volumes and counts from drawings so that each item of work can be priced.
Bill of quantities (BoQ)
A list of the items of work in a project with their quantities, units, rates and amounts.
Rate
The price per unit of an item, such as AED per m² of formwork.
Overhead and profit (OH&P)
An allowance, usually a percentage, added to cover running the business and earn a margin. What it is added to (direct cost alone, or including preliminaries) depends on the estimating method or the contract.
Formwork
The temporary mould that holds wet concrete until it hardens. It is measured in m² of contact surface.
Reinforcement (rebar)
Steel bars placed in concrete to carry tension. It is measured in tonnes.
Pile
A deep foundation element that carries structural loads down to stronger soil or rock. Piles may be bored, driven or formed in other ways.
Pile cap
A concrete block that sits on top of one or more piles and spreads the column load to them.
Ground beam
A beam that ties pile caps or footings together at foundation level.
Slab
A flat horizontal concrete floor or roof element.
Soffit
The underside of a slab or beam.
Blockwork
Walling built from concrete or similar blocks and mortar, measured in m².
Lintel
A beam that spans a door or window opening and carries the wall above.
Parapet
A low wall around the edge of a roof or balcony.
Scale
The ratio between a length on the drawing and the same length in real life, such as 1:100.
Level
One floor or storey of a building, taken off separately.
Resource
A labour, material or plant input used to build up a rate.
Rate build-up
The breakdown of a rate into resources such as labour hours, material and equipment.
Provisional sum
An allowance in the bill for work that cannot yet be fully measured or defined.
Bar bending schedule
A table listing every reinforcement bar by diameter, shape, length and number.

Guides by TapeLine, quantity take-off software from Natha & Co, founded by Natha Mohamed M.M.

Try Free Beta Version   See the 3D take-off

Locked in the beta

This feature is part of the full TapeLine experience.