Made for the work of estimating.
The kinds of measurements estimators take every day, with the unit and a check for each trade. Allowances below are common rules of thumb. Always follow your specification and supplier data.
| Trade | What you measure | Unit | Common allowance or check |
|---|---|---|---|
| Flooring | Floor area by room and finish; skirting length | m², m | Tiles: add 5 to 10 % for cuts and breakage, more for patterns or diagonal layouts |
| Painting | Wall and ceiling area, net of openings | m² | Multiply by the number of coats; check coverage per litre on the product data sheet |
| Drywall | Wall and ceiling board area; framing length | m², m | A 1,200 × 2,400 mm board covers 2.88 m²; allow for offcuts |
| Electrical | Points (sockets, lights, switches); cable runs | number, m | Add an allowance for drops, bends and terminations on cable lengths |
| Plumbing | Pipe length by diameter; fittings and fixtures | m, number | Count fittings separately from straight pipe |
| Concrete and structure | Volume of slabs, beams, columns, footings; formwork area; steel | m³, m², tonne | Steel kg per m³ of concrete should look reasonable against past jobs |
| Blockwork | Wall area, net of openings; lintels | m², number | About 11.6 blocks per m² for 400 × 200 mm blocks with 10 mm joints; add 3 to 5 % for breakage |
Flooring, painting, drywall
Areas for floors, walls and ceilings, and lengths for skirting and trim. Measure the net wall area once and use it for plaster, paint and board.
Electrical and plumbing
Counts for sockets, lights and fixtures, and lengths for cable or pipe runs.
Concrete and structure
Areas and lengths that feed slab, beam and column quantities. See concrete volume and formwork and the rebar weight chart.
General contracting
One place to combine take-off from several drawings into a bill of quantities, level by level.
Related guides.
Read more about take-off and estimating.
BoQ format and a worked sample ›
Layout, columns and a filled-in bill of quantities.
Take-off from PDF drawings ›
Scale, measuring and checking on PDF and CAD plans.
Take-off software buyer’s guide ›
What to check before you choose a tool.
Estimate cost from drawings ›
From quantities to rates, overhead, profit and contingency.
What is quantity take-off? ›
The method, step by step.
Rebar weight chart ›
kg per metre and metres per tonne.